Putnam High School Addition and Renovation Project

Putnam High School is currently undergoing a full renovation. The renovation is set to take place in 7 stages. As a part of this major renovation project EnviroMed Services inspection team has completed full asbestos, lead-based paint, PCBs testing for the building.

PCBs containing building materials were discovered in the interior and exterior of the school building. Additional testing was provided to determine the level of contamination in building materials. Such testing included the PCB containing materials and the adjacent surfaces. PCBs were found mainly in caulking and flooring materials. EnviroMed Services project design team prepared a HazMat abatement specifications and drawings staging the project into 7 stages to accommodate the presence of students and faculty during renovations.

EnviroMed currently providing abatement monitoring services for the High School including: asbestos, lead, PCB and dust monitoring